Example finding

Ashdown Pell Consulting Land at Elm Farm, drainage submission
  • Drainage Strategy, p.9

    Discharge from the site will be limited to 4.2 l/s.

  • Drawing C-201 rev P3, flow control note

    Flow control FC1 limits discharge to 3.8 l/s.

IssueCheck

Discharge rate stated two ways

Which one is right is for your engineer to decide.

The firm, site and documents are made up.

What it checks

  1. One figure stated two ways. The FRA gives a finished floor level of 24.60 m AOD on p.12; drawing C-101 rev P2 shows 24.45 m AOD.
  2. The drawing register against the title blocks. The register lists C-110 at rev P4; its title block says P5.
  3. A title block against its own revision table. C-130’s title block says rev P3; its revision table stops at P2.
  4. Cited revisions that don’t exist. The drainage strategy cites C-140 rev P4 on p.6; the latest in the set is P3.
  5. Totals that don’t add up. The transport statement gives 412 two-way trips on p.18; the rows of its Table 5.2 add up to 486.

What it doesn’t do

  • No design checking. It won’t tell you whether a pipe is big enough or a beam strong enough.
  • No code compliance. It doesn’t check anything against the Eurocodes, DMRB or local standards.
  • An engineer still signs off. Each finding is a pointer for your engineer to confirm, and some will turn out to be fine.

Price

First check free, then £300 a month per firm.

How to start

Reply to the email, or write to terry@issuecheck.co.uk.